Skip to main content
EUR

Need help? Call us +353 86 068 0516

Default locale English
Compare products
Profile

Welcome Guest

Manage Cart, Orders & Wishlist

Your Cart

Premium 3-Phase PDU

SKU: PREMIUM-ASIC-PDU

  24h Shipping 

8 Reviews

€399.87

(excl.VAT)
1

8 Reviews

Guaranteed Safe Checkout

Mineshop checkout options

Order confirmed within 24h
  • Tracked deliveryTo all 27 EU countries

  • Warranty & supportAfter-sales help

  • Card, bank, cryptoSecure checkout

Specifications: Premium 3-Phase PDU

Model3-Phase PDU

Also Known As3x63a 3-Phase PDU

Sizes95x15x5cm

Consume, kWhmax power draw 49.86kw

Temperature-5-40c

Warranty360days

Description for: Premium 3-Phase PDU

Premium 3-Phase PDU – High-Capacity Power Distribution for Modern Mining Rigs

Engineered for industrial-grade crypto mining operations, this premium 3-phase Power Distribution Unit (PDU) delivers reliable, high-efficiency power management for the most demanding ASIC miners on the market. Whether you're powering the latest Antminer S21, Whatsminer M60 series, or legacy units like the Antminer S19 and Bitdeer A2, this PDU has the capacity and compatibility to streamline your setup.


Key Specifications:

Specification Details
Total Output Ports 9 x C19 (3 per phase)
Voltage per Port 208–277V
Max Current per Port 20A (Individually fused)
Power Input 5x16mm² copper cable, 3x63A
Input Voltage Range 400–480VAC (3-phase)
Mounting Format Horizontal rack-mount
Total Max Output Power Up to 49.86 kW (9 ports @ 277V/20A)

Supported ASIC Miner Models:

Latest Generation:

  • Bitmain Antminer S21, S21 Hyd , S23

  • MicroBT Whatsminer M66 / M63 / M60 series

  • Canaan Avalon A15, A1566HA

Previous Generations:

  • Bitmain Antminer S19 / S19 Pro / S19 XP

  • Bitdeer A2 series

  • Whatsminer M30 / M31 / M50 series


Ideal for:

  • Large-scale mining farms

  • Immersion cooling deployments

  • Rack-based data center installations


Warranty

Factory warranty per manufacturer guidelines
Working product delivery guaranteed
Full after-sales support team

Terms of Sale

Payment proof required within 24 hours
Reservation confirmed upon receipt of payment
Industrial ASIC miners: all sales are final. Other products: 14-day return if unopened.

Shipping Information

Express: Europe 1–3 days, US & Asia 2–5 days
Economy: Europe 3–6 days
Dispatch within 7 working days
Ships via DHL, FedEx & UPS
Privacy policy · Cookie policy
Premium 3-Phase PDU
€399.87 €491.84 (excl.VAT) incl. VAT